| Task
Master 2" and 2 1/2" brass valve |
|
| Notice: As of June 1, 2007, the Taskmaster II brass 1 1/2" valve is discontinued. After June 1, 2007 systems will be quoted using the new and improved Taskmaster III 1 1/2" SS valve. The 2 and 2 1/2" Taskmaster is still available and will be in production for the foreseeable future. | |
| 1. | The
precision “Memory System” by Water King
controls time clock or semi-automatic operation. Water meter regeneration by totalized flow is also available.
The valve design keeps timer and valve synchronized. Patent No. 3732738. |
| 2. | Motor Driven Operation is not dependent on water pressure, and shifts smoothly without water hammer. The drive assembly accurately and consistently positions the plunger for each cycle. |
| 3. | Raw Water By-pass up to 70 gpm
on the FRF & FMF series, and 150 gpm on the FHF series is available
during all regeneration cycles. |
| 4. | Threaded Taps at the inlet
and outlet ports provide easy installation of test taps and pressure gauges. |
| 5. | Every Valve Is Tested Twice. Valves are hydrostatically pressure tested after
initial assembly and then tested again as part of the completed filter.
|
| 6. | All Brass Construction in the valve
body provides corrosion resistance. The valve has only one moving part –
the plunger. |
| 7. | NEMA 3 Enclosures provide rainproof
protection of electrical components. |
| 8. | All Plumbing is made up to the tank adapter (FHF only). |
| 9. | Injector System controls the
induction of potassium permanganate in FRF greensand filter models 45 through
150. On other filters that do not feed chemicals, the injector port is plugged.
Larger greensand filters use chemical injection pumps. |
| 10. | Electrical System is designed
to provide on/off signal for external electrical functions. |
| 11. | Service & Regeneration lights indicate valve positions. |
102 Charbonnet Road
Duson, Louisiana 70529
Phone 337 988 2360
Fax 337 981 7922