HOME - CTCI - 0791258-VJ1.03 - Documents

 
 

  CTCI Radar Surveillance Project - Documents


  • Please note the links in the "Download" column on the right of the table below. 
    Right click on the link and select "Save As..." to save a copy of the WKI
    Document to your local computer.

DOCUMENT No. DOC. TYPE DESCRIPTION REV LATEST UPDATE

DOWNLOAD

001 DOC Data Sheets / Specifications 06-25-10

PDF

001-1 DOC Chemical Feed Equipment - Catalog Sheets 06-29-10 PDF
001-2 DOC PLC Catalog Sheet 1 07-22-10 PDF
001-3 DOC MF Skid Mounting Catalog Sheet 06-29-10 PDF
001-4 DOC Automatic Backwash Strainer Catalog Sheet 1 07-22-10 PDF
002 DOC Exception & Deviation List 06-28-10 WORD
003 DOC Calculation Sheets - ---------- ---
003-2A1 DOC Attachment 1 Filter MM - Sizing 06-29-10 PDF
003-2A2 DOC Attachment 2 Filter AC - Sizing 06-29-10 PDF
003-2A3 DOC Attachment 3 Softener - Sizing 06-29-10 PDF
003-1 DOC Seismic Calculations - Mineral Tanks 07-21-10 PDF
003-2 DOC Process Design 06-28-10 WORD
003-3 DOC Seismic skid drawing from Structural Engineer 1 08-02-10 PDF
003-4 DWG Skid drawing For Fabrication from Water King 1 09-20-10 DWG
003-4 PDF Skid drawing For Fabrication from Water King (Stamped) 1 09-20-10 PDF
003-5 DOC Seismic Calculations - Skid 1 08-09-10 PDF
004 DOC Sub-orders to Sub-contractors List
005 DOC Fabrication Planning / Schedule
006 DWG Cross Section Drawings with Nomenclature of Parts & Materials
007 DWG Outline Dimension Dwg. W/ Information for Foundation, & Piping Design 1 07-30-10 DWG
007 DWG Outline Dimension Dwg. W/ Information for Foundation, & Piping Design (Stamped) 1 07-30-10 PDF
008 DWG Detail drawings for Fabrication
009 DOC Manufacturer Data Book
010 DOC Packing List with Sketch
011 DOC Special Tools List (if any)
012 DOC Installation, Operation, and Maintenance Manuals
013 DOC Instruction for Transportation and Storing
014 DOC Recommended List of Spare Parts Including Prices and Time for Delivery
015 DOC Complete Parts List
016 DOC Test/Inspection Certificates/Reports
016-1 DOC Prepare Hydrostatic Test Report
016-2 DOC Prepare Functional Test Report
016-3 DOC Prepare Electrical Point-to-Point Report
016-4 DOC Prepare Dimensional Inspection Report
016-5 DOC Prepare Paint Coating Thickness Report
017 DOC Expediting and Inspection reports
018-WPQ DOC Welding Procedure (WPQ) 09-07-10 PDF
018-PQR DOC Welding Procedure (PQR) 09-07-10 PDF
018-NDE DOC Accurate NDE Procedure 09-13-10 PDF
018-1 DWG Welding Map 1 09-20-10 DWG
018-1 DWG Welding Map (Stamped) 1 09-20-10 PDF
018-2 DOC Welder List 09-07-10 PDF
019 DOC Material Progress
020 DOC Inspection/Test Procedure 06-28-10 WORD
022 DWG Wiring Diagrams:  Power, signal, and control wiring --- ---------- ---
022-1 DWG Analog I/O Wiring Diagram 3 07-28-10 DWG
022-1 DWG Analog I/O Wiring Diagram (Stamped) 3 07-28-10 PDF
022-2 DWG DC Input Wiring 3 07-28-10 DWG
022-2 DWG DC Input Wiring (Stamped) 3 07-28-10 PDF
022-3 DWG DC Output Wiring 3 07-28-10 DWG
022-3 DWG DC Output Wiring (Stamped) 3 07-28-10 PDF
022-4 DWG High-speed Counters Output Wiring 3 07-28-10 DWG
022-4 DWG High-speed Counters Output Wiring (Stamped) 3 07-28-10 PDF
022-5 DWG Panel 5 07-28-10 DWG
022-5 DWG Panel (Stamped) 5 07-28-10 PDF
022-6 DWG PLC DC Inputs 1 07-28-10 DWG
022-6 DWG PLC DC Inputs (Stamped) 1 07-28-10 PDF
022-7 DWG PLC DC Outputs 1 07-28-10 DWG
022-7 DWG PLC DC Outputs (Stamped) 1 07-28-10 PDF
022-8 DWG PLC Pulse Inputs - Analog Outputs 1 07-28-10 DWG
022-8 DWG PLC Pulse Inputs - Analog Outputs (Stamped) 1 07-28-10 PDF
022-9 DWG Power Distribution 1 07-28-10 DWG
022-9 DWG Power Distribution (Stamped) 1 07-28-10 PDF
022-10 DWG AC Loads 1 07-28-10 DWG
022-10 DWG AC Loads (Stamped) 1 07-28-10 PDF
023 DWG Alarm wiring: To include: --- ----------- ---
023-1 DWG Low or high dosing mix 07-14-10 See 022
023-2 DWG Empty chemical supply 07-14-10 See 022
023-3 DWG Clogged or blocked filters 07-14-10 See 022
023-4 DWG Low or high output pressures or flow 07-14-10 See 022
023-5 DWG Pumps on or off 07-14-10 See 022
024 DWG Control Wiring: Display all relevant variables, status conditions, alarms, incidents, malfunctions, etc.
025 DWG Electrical one-line diagram 07-23-10 DWG
026 DOC Descriptions of operation sequences 1 06-29-10 WORD
026-1 DOC Valve Operation Schedule 1 08-04-10 EXCEL
027 DOC Logic Diagrams (ladder format) 08-18-10 PDF
028 DOC I/O List 2 07-22-10 WORD
029 DOC Alarm Points 1 06-29-10 WORD
030 DOC Status Indications 06-24-10 WORD
031 DOC Certificates of Shop Inspections and Data Reports: For products that require ASME Label, signed by product manufacturer.
032 DOC Welding Certificates
033 DOC Manufacturer Seismic Qualification Certification
034 DOC Source quality-control test reports
034-1 DOC Hydrostatically test before shipment to a minimum of 1.5 times pressure rating
034-2 DOC Functional test before shipment to verify proper operation of PLC and devices
034-3 DOC Electrical Point-to-Point test to verify proper electrical continuity of wiring
034-4 DOC Dimensional Inspection to verify that Overall dimesnions
034-5 DOC Paint Coating Thickness Inspection to verify Dry Film Thickness applied on skid
035 DOC Operation and Maintenance Data
036 DWG Outline drawing for all equipment, intruments and valves (P & ID) 5 08-04-10 DWG
036 DWG Outline drawing for all equipment, intruments and valves (P & ID) - Stamped 5 08-04-10 PDF
037 DWG Plan view and profile drawing for whole package for piping works (General Arrangement) 4 07-30-10 DWG
037 DWG Plan view and profile drawing for whole package for piping works (General Arrangement) 4 07-30-10 PDF
038 DWG Dimension of Space for skid mount: Show C.G., wght and anchor bolt location of all equipment (Civil Drawing) 3 07-30-10 DWG
038 DWG Dimension of Space for skid mount: Show C.G., wght and anchor bolt location of all equipment (Civil Drawing) - Stamped 3 07-30-10 PDF
039 DOC Instrument List 3 08-04-10 EXCEL

 

 